LABEL “SOLAR IMPULSE EFFICIENT SOLUTION”

generate profit while also reducing polluting emissions and preserving natural resources.”
Bertrand Picard
The Foundation’s goal is to bridge the gap between ecology and economy by reducing our impact on the environment while promoting economic development.
“The Solar Impulse Foundation was created precisely to prove that it is possible to reconcile economy and ecology by promoting the development of clean technologies and the development of renewable energies.”
What is the “Solar Impulse Efficient Solution” Label?
“Created by the Swiss explorer Bertrand Piccard following his world tour in a solar plane, the Solar Impulse Foundation has set itself an ambitious new challenge, namely to identify, select and promote 1000 clean technologies that protect the environment from profitable way: the #1000Solutions Challenge.”
“To select these solutions, the Foundation has launched the Solar Impulse Efficient Solutions label, which is awarded to clean technologies with a strongly positive environmental impact coupled with a solid economic model, that they allow the consumer to save money, that they whether they create jobs or demonstrate their commercial profitability. This in-depth solution assessment is carried out by a community of over 400 leading experts in areas such as clean energy, water, mobility, recycling, construction, and more.”
Among the elements of the application file, we present here in a synthetic way certain aspects of the environmental and financial impacts of GeoCassini.
TRADITIONAL SOLUTION
Topographic plan vector
background
• Detail cost explanation
200 km / 0,5 km/d = 400 d (survey)
400 d x 600 e/d = 240 000 euros
200 km / 0,5 km/d = 400 d (treatment)
400 d x 450 e/d = 180 000 euros
• Detail cost explanation
2 000 connections / 15 conn/d = 133d
133d x 600e/d = 79 800 euros
133 d x 450 e/d = 59 850 euros
559 650 euros
• The immobilization of site equipment(trucks, excavator,etc.) while waiting for the surveys
• Securing the trenches
• Maintenance of human resources,as long as the trenches are not filled in
GEOCASSINI SOLUTION
Versatile 3D lidar base
option 1 + option 3 = 95 000 euros either option 2 + option 4 = 22 400 euros
• Detail cost explanationt
option1-buying: 200 km x 250 e/km = 50 000 euros
option2-leasing: 200 km x 12e/km/year = 2 400 euros
option3-drawing: 100 d x 450 e/d = 45 000 e
option4-registration of GIS data in the digital twin : 20 000 euros
video with RezoCassini app produced by a technician already on site : 0,00 euros
9 m²/conn x 0,03 e/m² = 0,27 e / conn
2000 conn x 0,27 e = 540 euros
• No immobilization of site equipment(trucks, excavator,etc.) while waiting for the surveys
• Immediate backfilling of the trenches (no securing)
TRADITIONAL SOLUTION
Topographic plan vector
background
200 km / 0,5 km/d = 400 d (survey)
400 d x 30 km/d = 12000 km : 2,08 tCO2
Tacheometer + GPS during 400 d : 3,4 tCO2
400 d (treatments) : 2,5 tCO2
15 connections/d /2000 = 133 d
133 d x 30km/d = 3990 km : 0,69 tCO2
Tacheometer + GPS during 133 d : 1,11 tCO2
133 d (treatment) : 0,81 tCO2
• The immobilization of site equipment(trucks, excavator,etc.) while waiting for the surveys
• Securing the trenches
• Maintenance of human resources,as long as the trenches are not filled in
GEOCASSINI SOLUTION
Versatile 3D lidar base
400 km / 40km/d = 10 d (lidar + GCP)
400 km : 0,11 tCO2
Lidar during 7d : 0,21 tCO2
Tache/GPS during 3 d : 0,03 tCO2
30 d (treatment) : 0,19 tCO2
video with RezoCassini app produced by a technician already on site : 0,00 tCO2
Smatphone survey 10 d : 0,01 tCO2
Modeling/geo 45 d : 0,28 tCO2
• No immobilization of site equipment(trucks, excavator,etc.) while waiting for the surveys
• Immediate backfilling of the trenches (no securing)
• GeoCassini is designed to pool a single global digital twin and make it cross-functional between departments

95 650 euros
800 m/j ou 125 j
125 j x 650 e/j = 81250 euros
25% du temps “terrain” ou 32 j
32 j x 450 e/j = 14400 euros
Acquisition et géoréférencement du réseau aérien
5 km/j or 20 d
20 d x 650 e/d = 13000 euros
25% of survey time or 5 d
5 d x 450 e/d = 2250 euros
1 km/d or 100 d
100 d x 650 e/d = 65000 euros
10 km/d or 10 d
10 d x 450 e/d = 4500 euros
25 km/d or 4d
4 d x 650 e/d = 2600 euros
10 km/d or 10 d
10 d x 450 e/d = 4500 euros
20 km/d x 125 d = 2500 km : 0,42 tCO2
32 d: 0,07 tCO2
20 km/d x 20 d = 400 km : 0,06 tCO2
5 d : 0,01 tCO2
20 km/d x 100 d = 2000 km : 0,34 tCO2
10 d : 0,02 tCO2
25 km/d x 4 d = 100 km : 0,01 tCO2
10 d : 0,02 tCO2